Browse all practice questions for the American Concrete Institute (ACI) Practice Exam. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

American Concrete Institute (ACI) Practice Exam course image
More practice questions

These questions are part of the practice quiz. Start practicing

  • Is it necessary to tap the sides of the bowl after each layer has been rodded? true or false?
  • The sample of concrete for slump testing must be obtained in accordance with which ASTM standard?
  • How long must the temperature sensor remain in the freshly mixed concrete?
  • What is the maximum outside diameter of the vibrating element in millimeters?
  • Submerged depth for the temperature sensor in freshly mixed concrete should be at least how many inches?
  • Which of the following is NOT a mixer type listed for sampling?
  • The maximum size aggregate allowed in this test method?
  • The pressure method cannot be used on concrete containing which of the following aggregate types?
  • Before filling, the slump mold should be kept in which condition?
  • The initial quantity of water and alcohol added to the air meter can be poured directly into the neck of the top section of the air meter. True or False?
  • If the concrete contains aggregate larger than the maximum allowed for this test, the sample must be ______.
  • For rodding consolidation, the mold should be filled in how many layers?
  • After final set, how many hours must pass before transporting the specimens?
  • The measurement for slump is made from the top of the mold to what point of the concrete specimen?
  • When the concrete contains aggregate larger than allowed for the slump test, the large aggregate must be _____.
  • What is the approximate volume of the measuring cup used to add water to the air meter, in relation to the volume of the air meter bowl?
  • The surface on which the slump mold is placed must be which of the following?
  • Prior to lifting the slump mold, concrete must be removed from which part?
  • The slump mold should be in a dry condition before beginning the test.
  • The minimum thickness of a glass or acrylic strike-off plate is 0.50 inches. True or False?
  • A slump reading is rounded to the nearest which value?
  • When rodding the bottom layer, the tamping rod must be placed to uniformly distribute the strokes?
  • Portions of a composite sample shall be thoroughly remixed before beginning tests on the sample.
  • Concrete mixtures with specified strengths of 6000 psi [40 MPa] or greater shall have an initial curing temperature between __________.
  • After submerging the device, how should the surrounding concrete be placed around the device?
  • What is the height of the slump mold?
  • Can a plastic container be used for the measure in this slump test method?
  • What is the minimum allowable capacity of the measuring bowl used in this test method?
  • Is the statement 'The tamping rod penetrates about 2 inches into each layer' correct?
  • What is the maximum allowed transportation time for test specimens?
  • When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middle portion of the batch.
  • True or False: If less than 2.5 pints of alcohol are used, the air content is always indicated by the final meter reading.
  • For cylinders with a diameter of 6 in. [150 mm] or greater, the tamping rod must be a round, straight steel rod with a diameter of _____.
  • When filling the bowl of the air meter, the concrete must be placed in ___ layers of equal depth.
  • What is the minimum outside diameter of the vibrating element in inches?
  • Tests that must begin within a limited time after fabricating the composite sample include which of the following?
  • When internal vibration is used to consolidate a standard flexural strength test specimen, the technician should insert the vibrator at intervals not exceeding _____ along the center line of the beam.
  • At the end of the procedure, what is the state of the air meter?
  • When rodding the middle and top layers, the tamping rod should penetrate into the layer below approximately _____?
  • If portions of undisturbed concrete are found in the air meter at the end of the test, what should be done?
  • Which solvent concentration by weight is specified for the alcohol used in this test method?
  • Air meter bowls used for this test must conform to which ASTM standard and be calibrated for volume according to which ASTM standard?
  • What is the required shape and material for the tamping rod used for cylinders of 6 in diameter or greater?
  • The approximate depth after placing the first layer is which value?
  • After the final rodding, the sides of the slump mold should be tapped lightly with the tamping rod. True or False?
  • The depth of the second layer is approximately which value?
  • The concrete sample must be protected from contamination and _____.
  • If the concrete drops below the top of the slump mold during rodding the top layer, what should be done?
  • Which standard is used for determining the temperature of concrete in field sampling?
  • If the air content exceeds the 9 percent range of the meter, what action should be taken?
  • After rodding each layer, what should be done to the measure before adding another layer of concrete?
  • The temperature measuring device shall have a capacity to measure temperature of freshly mixed concrete with which resolution and range?
  • How many strokes are required per layer when rodding the sample?
  • How much time is allowed to conduct the slump test from beginning to completion?
  • The composite sample from a truck mixer is taken from which portion of the batch?
  • The volumetric method of determining air content of concrete can be used on concrete containing which types of aggregate?
  • If the concrete is to be consolidated by vibration, a standard 4x8 inch [100 mm by 200 mm] cylinder mold must be filled in how many equal layers?
  • Field curing is used to assess which aspect of concrete?
  • A standard test cylinder used for compressive strength testing has which nominal dimensions?
  • If vibration is the method of consolidation, the measure must be filled in approximately equal layers.
  • According to ASTM C1064, what is one reason to take the temperature of concrete?
  • The slump test maximum aggregate size for plastic concrete is 1.5 inches (37.5 mm). Which option matches this value?
  • Which action is not a designated method of consolidation for this procedure?
  • Calibration frequency for the temperature measuring device is best described as which?
  • What preparation must be done to the sample container prior to sampling?
  • A paving mixer composite sample must represent a minimum of how many portions of the batch after discharge?
  • Vibration of the concrete sample is not allowed when the slump of concrete exceeds _____.
  • After reading the temperature, what is required?
  • The sample of concrete used for temperature determination must be rodded 25 times. True or False?
  • Which of the following describes standard curing?
  • The temperature of concrete is reported to the nearest degree Fahrenheit.
  • When should serviceability cylinders be removed from the mold?
  • Standard curing is the curing method used when test specimens are to be used for ______.
  • Is measuring the temperature in a wall form permitted?
  • Sampling by this method is required when tests are to be made to determine _____ with specification requirements.
  • What is the volume of the mold used for sampling in cubic feet?
  • ASTM Method gives standardized requirements for _____, _____, _____, and _____, of test specimens.
  • Which action is not a step in the slump test procedure?
  • If the slump is less than 1 inch, which consolidation method must be used?
  • When consolidating a flexural strength test specimen by rodding, rod one stroke for each _____ of top surface area.
  • When using an internal vibrator to consolidate a 6 by 12 in. compressive strength test specimen, the vibrator must be inserted at _____ different points for each layer.
  • When rodding a standard 6 by 12 in cylinder, each layer must be rodded _____ times.
  • This method covers sampling from four types of mixtures which are _____, _____, _____, and _____.
  • Which statement is true about the consolidation methods described?
  • Before weighing, the surface of the sample mold must be prepared by which action?
  • The 6 by 12 inch cylinder mold corresponds to what metric dimensions?
  • What tools may be used to strike off the top surface of the concrete following consolidation of the final layer?
  • What is the maximum allowed transportation time for test specimens, in hours?
  • The temperature and moisture environment for field cured cylinders must be __________.
  • The total agitation time must be at least how many seconds?
  • The 9% range refers to what aspect of the meter?
  • Which statement about the interior surface of the slump mold is correct?
  • When aggregate larger than permitted for a test method, the sample must be subjected to which processing step before the test?
  • When large amounts of alcohol are used, the direct reading will tend to indicate which of the following about the air content?
  • What is the consequence of finding portions of undisturbed concrete in the air meter at the end of the test?
  • The composite sample for a paving mixer must represent a minimum of _____ different portions of the batch taken from the pile after discharge.
  • Which statement is true about the slump test procedure?
  • Concrete samples from a truck mixer must be obtained before any water or admixtures are added to the mixer at the job site. True or False?
  • Specimens shall not be transported until ______ hours after final set.
  • In the slump test, how many roddings are prescribed per layer?
  • Measures other than air meter bowls used for this test must conform to which ASTM standard?
  • Which statement is true regarding the maximum aggregate size for this method?
  • When the concrete contains aggregate larger than that permitted for a particular test method, the sample of concrete must be _____ before making the test.
  • After completing the strike-off procedure, what must be done before weighing the measure and sample?
  • Each layer should fill approximately what fraction of the mold's volume?
  • When raising the slump mold, should it be rotated or twisted?
  • During transportation, test specimens must be protected from damage due to ____,____, and ____.
  • Upon completion of initial curing, the test specimens may be left in their molds and sealed in plastic bags. true or false?
  • The composite samples from a truck mixer must be obtained from what portion of the batch?
  • When rodding the concrete sample, what is the specified number of strokes required for each layer?
  • The slump test is applicable to plastic concrete with a maximum size aggregate of what?
  • In field curing, test results are compared to which standard?
  • After molding test specimens, you should wait two hours before moving them to the location of initial storage. True or False?
  • What is the required minimum frequency of the vibrator used in this slump test method?
  • The standard 4x8 inch cylinder mold is used specifically for which consolidation method?
  • Is measuring the temperature in a wheelbarrow permitted?
  • In consolidating the concrete by vibration, how many times should the vibrator be inserted into each layer?
  • When more than 2.5 pints of alcohol are used, the final meter reading is adjusted using which factor?
  • The initial curing temperature range for high-strength concrete (6000 psi or greater) is within which range?
  • What is the minimum thickness for a glass or acrylic strike-off plate?
  • The pressure method for determining air content can be used in concrete containing which aggregate?
  • What is the Fahrenheit temperature range for the device?
  • Tamping rod penetration into each layer should be approximately how deep?
  • During transportation, which of the following is the proper way to protect specimens?
  • The minimum size sample for making strength test specimens is _____.
  • Up to 48 hours after molding, test specimens that are to be standard cured shall be stored in a temperature range between _____ to _____.
  • If the concrete sample is to be consolidated by vibration, the measure is filled in _____ layers.
  • Which statements are required for the initial meter reading to be considered valid?
  • Is a composite sample required if the sole purpose is to determine temperature?
  • Which tool is used to remove excess concrete from above the mold after final consolidation?
  • Vibration is not allowed when the slump exceeds which value?
  • What type of alcohol and concentration must be used in this test method?
  • Which statement is true about standard curing and field curing in terms of comparison of results?
  • The slump mold is filled in how many layers?
  • For a measure of 0.5 ft^3, how many strokes of the tamping rod are required for consolidation of each layer?
  • What is the maximum size aggregate allowed for this test method?
  • 0.25 inches is approximately equal to how many millimeters?
  • The maximum duration of a single inversion is how many seconds?
  • Which option correctly pairs the first and second layer depths?
  • During the air meter procedure, how long is an individual inversion limited to, and what is the minimum total agitation time?
  • What is the Celsius temperature range for the device?
  • If, after consolidation of the final layer, the concrete level is 1/2 in. above the top of the measure, what should be done?
  • For concrete with a slump of less than 1 in. [25 mm], the test specimens must be consolidated by what method?
  • After rodding a layer, what action is recommended before adding the next layer?
  • Which of the following is not listed as an eligible aggregate type for the volumetric air content method?
  • The volumetric method of determining air content can be used on concrete containing which aggregate types?
  • The 6 by 12 in cylinder mold mentioned has metric dimensions of what?
  • Which statement correctly describes stationary mixer sampling?
  • The final meter reading is reported to what precision?
  • When consolidating a 6x12 cylinder using internal vibration, how many insertion points per layer are required?
  • The maximum allowable time between obtaining the first and final portion of a composite sample is how many minutes?
  • Which statement is true about the reference point for slump measurement?
  • When strength specimens are to be made, they must be tested for what properties?
  • The supporting surface on which specimens are stored shall be level within what tolerance?
  • Which statement about the final portion timing is correct?
  • Which statement best describes the purpose of the strike-off tool in finishing concrete after consolidation?
  • Where is the final reading taken on the air meter?
  • For the slump test, the ends of the tamping rod must be which shape?
  • The molding strength of test specimens shall begin within ____ minutes after fabricating the composite sample.
  • Which curing method is used to determine whether a structure may be put into service?
  • If the concrete slump is greater than 3 inches, which consolidation method must be used?
  • What is the diameter of the tamping rod used in the slump test?
  • The maximum elapsed time allowed between obtaining the final portion of the composite sample and beginning the tests for slump, temperature, and air content is _____ minutes.
  • How much time is allowed for lifting the slump mold?
  • How many rolling operations are performed in the procedure?
  • After reading the temperature, which statement best reflects the required action?
  • What is the minimum thickness of a metal strike-off plate?
  • To what precision is the final liquid level in the neck of the air meter read?
  • The measuring bowl capacity minimum is specified as at least:
  • Which ASTM standard governs the sampling of fresh concrete for test specimens?
  • What is the specified weight of the mallet used on measures that are 0.5 ft3 [14 L] or smaller?
  • The minimum submersion depth corresponds to approximately how many millimeters?
  • Which option lists the correct second-layer depth?
  • Field curing is the curing method used when test specimens are to be used for __________.
  • The slump is measured and reported to the nearest how many inches?
  • Which of the following options correctly identifies mixer types included in the sampling method?
  • Which statement best describes the maximum aggregate size allowed for this test method?
  • Which purpose does the isopropyl alcohol serve in the meter procedure?
  • A 6 by 12 in [150 mm by 300 mm] cylinder mold can be used for concrete containing aggregate with particles not exceeding _____ in size, without the need for wet sieving the concrete.
  • When rodding each upper layer of concrete in a cylinder, the tamping rod should penetrate into the underlying layer by about _____.
  • What are the minimum and maximum outside diameters of the vibrating element?
  • Cylinders made for the purpose of determining when a structure may be put into service shall be removed from the mold __________.
  • Upon filling of the air meter with water, what part of the liquid level should be adjusted to the zero mark on the meter?
  • If the concrete sample is to be consolidated by rodding, the measure is filled in _____ layers.
  • Which duration is correct for the device to remain in the concrete?
  • The slump test mold is shaped like which geometric form?
  • Which statement is true about the environment for field-cured cylinders?
  • When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of _____ regularly spaced intervals during discharge of the middle portion of this batch.
  • Standard curing is used for test specimens intended for which purposes?
  • The field curing environment for cylinders must be...
  • Which value represents the approximate depth after placing the first layer?
  • The minimum frequency of an internal vibrator used in this procedure is _____.
  • A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True or False?
  • After consolidation of the final layer, an excess of concrete ____ above the top of the measure is considered optimum.
Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy